猴子岩水电站位于四川省甘孜藏族自治州康定县境内,部分库区在甘孜州丹巴县和阿坝州小金县境内。工程规模为一等大(一)型,采用坝式开发,枢纽建筑物由拦河坝、两岸泄洪及放空建筑物、右岸地下引水发电系统等组成,最大坝高223.5米,为国内第二高面板堆石坝。猴子岩水电站规划总装机容量1700M Monkey Rock Hydropower Station is located in Kangding County, Ganzi Tibetan Autonomous Prefecture in Sichuan Province, part of the reservoir area in Ganzi Prefecture Danba County and Aba Prefecture within the territory of Xiaojin County. The scale of the project is first-class (one) type. It adopts dam-style development. The pivotal buildings are composed of barrage, flood discharge and venting structures on both banks and underground water diversion and power generation system on the right bank. The maximum dam height is 223.5 meters and is the second highest panel reactor in China Dam. Monkey Rock Hydropower Station total installed capacity of 1700M
其他文献
Objective To explore etiological characteristics of hand,foot and mouth disease(HFMD)in Xinjiang in2013.Methods A total of 1 287 samples of HFMD cases were test
目的 探讨药物黏堵绝育术后近端输卵管闭塞的手术复通效果.方法 对1986年8月至2004年4月间,在中山大学附属第二医院住院的曾接受药物黏堵绝育术,后因各种原因而再行输卵管复通术--输卵管子宫角移植术患者208例的临床资料进行回顾性分析.结果 (1)术中检查输卵管闭塞部位均发生在间质部及峡部.(2)65例盆腔有不同程度粘连,其中57例为轻度疏松粘连,7例为中度粘连,仅1例为重度粘连.(3)输卵管复