论文部分内容阅读
我們为了充分发揮陈旧設备的潛力,加快水利建設速度,解决施工劳力不足的困难,經过全体职工的积极努力,修复了一艘吸揚式柴油电动挖泥船,并于去年五月投入生产。挖泥船先后承担了哈尔濱市馬家船口松花江堤防块基加固冲填和哈尔濱市万家灌区水中开渠两項試驗性的施工任务。馬家船口堤防坝基加固工程长度六百三十三米,加固寬度三十米,高度两米半,堤坝两面临水,取土困难,是哈尔濱市松花江重要險工堤段;万家灌区一千米引水渠,全部是水中施工,施工条件比較困难。这两項工程自去年6月1日至10月底利用挖泥船施工,經过三
In order to give full play to the potential of obsolete equipment, accelerate the pace of water conservancy construction and solve the difficulties of inadequate construction labor force, after a positive effort by all staff and workers, we repaired a suction diesel electric dredger and put it into operation last May produce. The dredger has successively undertaken two pilot construction tasks of strengthening the embankment block of Songhua River pier in Majiakou, Harbin and opening of water in Wanzhou Irrigation District of Harbin. Ma Jia Shiping embankment dam foundation reinforcement project length of 633 meters, reinforcement width of 30 meters, a height of two and a half meters, both sides of the dam facing water, earth difficulties, is an important section of the Songhua River in Harbin embankment section; Km diversion canal, all water construction, construction conditions are more difficult. The two projects were started with dredgers from June 1 to the end of October last year, after three