地下岩石隧道下穿既有高层建筑物安全性分析

来源 :地下空间与工程学报 | 被引量 : 0次 | 上传用户:gsdx2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在某城市地下隧道下穿既有建筑物工程中,考虑了既有建筑物的剩余安全度,制定了穿越处既有建筑物的风险控制指标和标准,并依据该市实际地层条件、建筑物等效刚度、等效荷载、地下隧道CRD开挖工法、施工错距等因素,建立FLAC~(3D)数值计算模型,模拟了隧道穿越建筑物的全过程,对既有建筑建筑物的沉降、倾斜规律进行预测分析。分析表明:四号导洞开挖施工,隧道拱顶最大沉降值为4.94mm,建筑物基底最大沉降量和倾斜值均满足控制标准,桩基嵌入深度不在隧道开挖引起的岩土塑性区影响范围之内。 In a city under the tunnel through the existing buildings under construction, taking into account the existing building of the remaining safety, developed through the existing buildings at risk control indicators and standards, and the actual conditions of the city under the conditions of buildings Equivalent stiffness, equivalent load, CRD excavation method of underground tunnels, construction error and other factors, the FLAC 3D numerical model is established to simulate the whole process of tunnel crossing the building, the settlement of existing buildings, Tilting rule for predictive analysis. The analysis shows that the maximal settlement of the tunnel vault is 4.94mm when the pilot tunnel of No.4 is under excavation. The maximum subsidence and slope of the building base meet the control standards. The embedment depth of the pile foundation is not affected by the plastic zone affected by tunnel excavation within.
其他文献
本文介绍了一种新型的可调频闪仪的结构及其工作原理。
本文提出了一种基于液压爆膜原理的压力动态校准方法,理论分析与实验结果表明该方法可以满足液压系统0~40MPa压力范围、0~2kHz工作频带的压力动态校准要求。
就日光节能温室油桃早果丰产栽培技术从大苗定植、扣时间的确定、全园覆膜、多效唑控冠、蜜蜂与人工辅助授粉等几个方面进行了试验和探讨.