土坝上游铺盖防渗的研究

来源 :水利学报 | 被引量 : 0次 | 上传用户:chenzulong198867
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文指出土坝上游用铺盖防渗是一种符合多、快、好、省的方法.本文主要研究了下列问题:1.介绍基础土壤的管涌可能性及其所谓抗渗强度的概念,并讨论它们对设计铺盖长度的影响;2.讨论了经济安全的铺盖长度、厚度及渗流量计算;3.确定斜墙后浸润线的位置及铺盖下等势线的分布.选择最短铺盖长度,主要取决于下面两个条件:1.铺盖下坝基渗透坡降 j_0小于或等于坝基土壤的尤许坡降(以不发生渗透变形为原则);2.单宽渗流量小于或等于允许设计渗流量 (以蓄水水能利用为原则).根据巴夫洛夫斯基的分段法原理及上述原则得到下列计算公式.铺盖长度计算:表示第一个条件的计算公式为(15)式;表示第二个条件的为(14)式.给定了铺盖长度后,渗流量按(18)式计算.铺盖的厚度按(25)式计算.从72个试验资料证实本文所建议的计算公式在目前说来,较其他国内外学者的公式精度高.从理论和试验研究结果可得铺盖防渗的几点重要的概念:1.铺盖的透水性愈小(k_0/k_n≥5000)防渗的效用也就愈大,反之防渗的效用则很小.2.不管铺盖的透水性强与弱都存在着“有效铺盖长度”的概念,即铺盖的长度如大于有效铺盖长度时,它的防渗作用不显著.“有效铺盖长度”是随铺盖的透水性增加而减小.3.想用强透水性的铺盖防渗(不管铺盖怎样长),要达到弱透水性铺盖那样的效果是不可能的(指渗流量的大小而言),因此,铺盖的透水性愈小愈好,k_0/k_n 值最好至少大于2000. This paper points out that the seepage control in the upstream of earth dam is a kind of method that meets the needs of more, faster, better and more economical.This paper mainly studied the following problems: 1. Introduced the possibility of pipe infiltration and its so-called impervious strength Their impact on the design cover length; 2. The economical and safe bedding length, thickness and seepage flow calculation are discussed; 3. The location of the subsidence line and the distribution of the equipotential lines under the cover wall are determined. The choice of the shortest cover length mainly depends on Under the following two conditions: 1. Under the cover dam foundation seepage gradient j_0 less than or equal to the dam foundation soil slope (according to the principle of infiltration and deformation does not occur); 2 single-width seepage flow is less than or equal to allow design seepage flow According to the principle of piecewise method of Pavlovsky and the above principle, the following calculation formula is obtained: The calculation of the cover length: The formula for expressing the first condition is (15); the second Given the length of the bedding, seepage flow is calculated by Equation (18), and the thickness of the bedding is calculated as (25). From the 72 experimental data, it is verified that the formula proposed in this paper is Come, more than other domestic and foreign scholars fine formula The degree of high.From the theoretical and experimental research results can be seepage control seepage a few important concepts: 1 cover the water permeability of the smaller (k_0 / k_n≥5000) seepage control effect is greater, while the effectiveness of seepage control It is very small.2.It has the concept of “effective cover length” regardless of the strong and weak water permeability of the coverings, that is, the impervious effect is not significant when the cover length is greater than the effective cover length. “Effective cover length” is With the increase of water permeability of the cover decreases .3 want to use a strong permeability of the cover impermeable (no matter how long the cover), to achieve the effect of weak permeability of the cover is not possible (referring to the size of the seepage flow) Therefore, the smaller the water permeability of the cover, the better, k_0 / k_n value is preferably at least greater than 2000.
其他文献
在我国南方云、贵、两广及湘、浙部分地区,广泛分布在炎热潮湿气候条件下生成的棕黄红色残积坡积粘土,其天然含水量高,天然干容重低,粘粒含量及塑性均高,压实性能差,但压缩
由于一些工业发达国家水力资源的大力开发,最有利的水电点子逐渐减少。近年来太多国家又重新重视中小型水电站的发展。在这些中小型水电站开发点子中,有建设低水头、长压力引
1 病例报告患者,男,10岁,因跨跃约2m壕沟跌倒致右膝关节肿胀、畸形,不能站立2小时入院。查体:右膝关节肿胀、畸形,髌骨压痛(-),股骨远端压痛(+),右足背动脉搏动存在。摄片示
一、概述关于水平地震作用于鉛直坝面的动水压力,威斯特喀尔德(H.Westergarrd)首先提出了解析的答案. 关于水平地震作用于傾斜坝面的动水压力,让格尔(C.M.Zanger)首先提出了
长江下游,自九江的锁江楼至江阴的鹅鼻嘴,流经江西、安徽和江苏三省,全长664公里.它塑造的广阔冲积平原,历来是我国生产比较发达的地区.解放前,长江洪水灾害频繁,堤 The lo
沿长江顺流而下,可以看到千山万谷,汹涌澎湃的三峡,也可以看到九曲回肠的荆江和潮平岸阔的江苏江段。在宜昌南津关,“山随平野尽,江入大荒流”(李白《渡荆门送别诗》)。长江
通过调研径向水平井在国外钻井所需要的地质条件及目前国内水平井工艺要求,提出了优选径向水平井目标区应考虑的地质参数,选择了明90断块作为优选目标区。通过对优选目标区的精
音节结构是语言音系中的一个基本特征。音节中的结构位置的多少和每个结构位置上的可以出现哪些音素是音系学中的重要内容。在汉语方言描写中,音节一般按传统用声母、韵母、
为配合设计洪水计算规范的工作,本刊连续介绍了陈家琦等同志所写的“最大流量推理公式图解分析法诺模图”、“概化多峰三角形设计洪水过程线”及本篇“计算最大流量推理公式
本文通过陆水电站4号机叶片应力实测结果的分析和与现有文献资料的比较,对轴流式水轮机在稳定运行工况以及在启动、甩负荷等过渡工况下叶片的应力状态进行了较为详细的阐述。