论文部分内容阅读
一、灌区工程及喷灌自动化概况八三提水站及其地下输水管路原为大庆油田输油管线工程所建,为充分发挥其作用,改为平时供农田灌溉使用,工程建设标准较高,有利于实现自动化。灌区主要工程包括:渠首进水闸,引水渠
I. Overview of Irrigation Works and Sprinkler Irrigation Automation The 83 Santiwater Station and its underground water pipelines were originally constructed for the Daqing Oilfield Pipeline Project. In order to give full play to their role, they were generally used for farmland irrigation instead of high-level construction projects with Conducive to automation. Irrigation major projects include: head of intake, diversion canal