Recent developments of large diameter X80 UOE line pipes

来源 :Baosteel Technical Research | 被引量 : 0次 | 上传用户:tezon1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
High-strength pipeline steel and large diameter line pipes are often used to increase the capacity of transportation and reduce the cost associated with the construction and operation of long-distance gas pipeline projects. China’s initiatives to construct long-distance natural gas pipelines has brought in new opportunities for the development of X80 line pipes. Baosteel has designed the optimum chemical composition of X80 with high niobium and low molybdenum content. In addition,a welding experimental platform and a finite element model(FEM) have supported the development of X80 UOE pipes in an efficient and economical way. The application and recent development of X80 UOE pipes were introduced in this paper. To comply with the requirements of the Second West-East Gas Pipeline Project(2ndWEPP),X80 pipeline steel with low carbon bainite microstructure was developed by utilizing the optimized composition and TMCP process. The matching welding material,welding procedure and UOE forming processes for 1219mm outside diameter X80 UOE pipes were also developed. More than 340000 t of X80 UOE pipes were produced and applied in the 2ndWEPP. Furthermore,to meet the prospective demand for long-distance gas pipelines with an annual transportation capacity of over 40 billion m3,larger size X80UOE pipes with 1 422 mm OD × 30. 8 mm WT were trial produced recently. DWTT performance,the main technical challenge for heavier wall pipes,was improved by using optimized microstructural design. The newly developed X80 pipes can be potentially used for larger transportation capacity pipelines in China. High-strength pipeline steel and large diameter line pipes are often used to increase the capacity of transportation and reduce the cost associated with the construction and operation of long-distance gas pipeline projects. China’s initiatives to construct long-distance natural gas pipelines has brought in new opportunities for the development of X80 line pipes. Baosteel has designed the optimum chemical composition of X80 with high niobium and low molybdenum content. In an efficient and economical way. The application and recent development of X80 UOE pipes were introduced in this paper. To comply with the requirements of the Second West-East Gas Pipeline Project (2nd WPEP), X80 pipeline steel with low carbon bainite microstructure was developed by utilizing the optimized composition and TMCP process. The matching welding material, welding procedure and UOE forming p More than 340000 t of X80 UOE pipes were produced and applied in the 2nd WEPP. Furthermore, to meet the prospective demand for long-distance gas pipelines with an annual transportation capacity of over 40 billion The newly developed X80 pipes were probable to produce recently. DWTT performance, the main technical challenge for heavier wall pipes, was improved by using optimized microstructural design. used for larger transportation capacity pipelines in China.
其他文献
液压缸体与导向套采用内卡环方式连接,在有关设计手册中,有内卡环强度计算方面的叙述 ,但对于内卡环分成几瓣,未有介绍.在生产实践中,常常分成3瓣,在装配时,有时会发生干涉而
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
This paper studies the chemical composition,tensile properties,inclusions,metallogrophic structure,and other such parameters to identify the causes of cracking
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
1制种玉米施肥的现状和农户的施肥习惯玉米制种是甘肃省河西走廊第一大农业支柱产业,从20世纪80年代末逐步发展到目前的全国第一玉米制种基地,是全国玉米杂交种主要产区之一
This study aims to systematically analyze the key parameters of the reflow process that influence the uniformity of the chromium passivation film coated on tinp
1 基本情况rn宣威市位于云南省东北部,是云南省最大的农业县级市,总面积6 069.88km2,有耕地面积14.5万hm2,总人口142万人,其中农业人口127万人,山区、半山区占全市面积的95%,
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥