南水北调中线一期工程运行管理研究

来源 :河南水利与南水北调 | 被引量 : 0次 | 上传用户:keioy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
南水北调中线一期工程供水的成败某种意义上说主要决定于其运行管理体制设计的成功与否,为保障调水顺利实施。文章在前人研究基础之上,结合已实施国外跨流域调水工程管理的成功经验,通过分析南水北调中线一期工程运行管理特点,提出既要体现政府职能,实现水资源合理配置,又充分发挥现代企业制度的优势,实现工程良性、安全、持久的运行期管理体制,为保障发挥工程预期效益及社会作用提供科学依据。 The success or failure of the water supply in the first phase of the South-to-North Water Diversion Project depends on the success or failure of the design of its operation and management system in order to ensure the smooth implementation of water diversion. Based on the previous research and combining with the successful experience of trans-basin water diversion project management in foreign countries, this paper analyzes the operational management characteristics of the first phase project of South-to-North Water Diversion Middle Route and proposes that it not only reflect the functions of government, but also give full play to the rational allocation of water resources The advantages of modern enterprise system to achieve a benign, safe, long-term management system of operation period, to provide the scientific basis for ensuring the project expected benefits and social role.
其他文献
随着社会经济的快速发展与城市化建设步伐的加快,洪涝灾害造成损失的严重程度在增加。近几年,黄岩城区暴雨后洪涝灾害时有发生。文章从黄岩城区防涝灾问题着手,探讨城市洪涝
目的 :了解肺癌的误诊情况 ,观察各级医院对肺癌的误诊是否有差别 ,并通过对误诊的分析提出减少误诊的建议。方法 :对从 1986年 8月 2 9日至 1998年 9月 1日确诊的 941份肺癌
期刊
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
从 196 7年急性呼吸窘迫综合征(ARDS)命名以来 ,诊断方法和界定标准已经取得共识 ,理论研究非常活跃。尽管各种疗法不断出现 ,但疗效满意 ,操作简单方便 ,费用经济 ,易于为临
期刊
我国已建水库大多从安全角度出发在整个汛期采用固定汛期限制水位渡汛,造成部分水库出现汛期不敢蓄水且弃水较多、汛后却难以蓄满的现象,在一定程度上影响了水库综合利用效益
近年来异位妊娠的不典型病例逐渐增多.我院近年共收治异位妊娠72例,其中不典型异位妊娠47例,运用综合检查手段积极确诊后,行中西医结合保守治疗,取得满意效果.现回顾总结如下
刘玉清教授认为喉源性咳嗽病因不外乎外感与内伤,其中风邪为主要致病因素,可兼夹其他因素共同致病,病位在咽喉,与肺密切相关,不离五脏,主要病机为风邪上扰,肺气不利,以疏风利