论文部分内容阅读
《中华人民共和国城乡规划法》(以下简称《城乡规划法》)第六十六条、第六十八条规定:城乡规划主管部门对未经批准进行临时建设、未按照批准内容进行临时建设以及临时建筑物、构筑物超过批准期限不拆除的建设单位或者个人有权作出责令停止建设或者限期拆除的决定。对于当事人不停止建设或者逾期不拆除的,建设工程所在地县级以上地方人民政府可以责成有关部门采取查封施工现场、强制拆除等措施。上述条
The “Urban and Rural Planning Law of the People’s Republic of China” (hereinafter referred to as “Urban and Rural Planning Law”) the sixty-sixth, sixty-eighth provides: urban and rural planning authorities without permission for temporary construction, not in accordance with the approval of the content of temporary construction and Construction units or individuals whose temporary buildings and structures are not demolished beyond the approved period shall have the right to make a decision to stop construction or demolish them within a prescribed period of time. Where the parties concerned do not stop construction or overdue, the local people’s government at or above the county level where the construction project is located may order the relevant departments to take such measures as seizing the construction site and forcibly removing it. The above article