论文部分内容阅读
兰州召开铁路标准设计工作座谈会以后,交通部又发了(72)交基铁字821号文关于做好标准设计三年规划工作的通知,各单位的领导都比较重视,分别制定了贯彻兰州座谈会精神的措施,相继建立了标准设计管理科、组,配备了专职或兼职的标管人员,进行了图纸清查和标准设计三年规划的落实工作。第四铁路工程局在局设计处成立了标管科,作为全局标准设计的专职管理机构,各总队已设有专职标管人员,局施工处、工程处和各勘测队、站设队都设了兼职标管人员;制定了局内标准设计管理办法;对现行使用的600多项图纸进行了逐项审查,摸清了家底,发现了问题,并编印了标准设计图纸目录和作废图目录。在规划方面,铁四局担负了站后五个专业的归口汇总工作,
After Lanzhou held a symposium on railway standard design work, the Ministry of Communications issued another circular (72) to cross the basis of the letter No. 821 on the standard design of the three-year planning work notice, the leaders of all units attach great importance to the formulation of the implementation of Lanzhou Symposium spirit of the measures, have set up a standard design management division, group, with full-time or part-time standard staff, carried out the drawings and standard design standard three year plan implementation. The Fourth Bureau of Railway Engineering has set up a standard pipe department at the Design Bureau of the Bureau as a full-time management agency for the design of global standards. All Corps teams have set up full-scale standard-control personnel, construction bureau, engineering department and survey teams. Part-time standard staff; developed a bureau standard design management approach; the current use of more than 600 drawings were reviewed one by one, find out the bottom of the family and found the problem, and printed the standard design drawings directory and scrap map directory. In terms of planning, the Fourth Railway Bureau took charge of the centralized work of five professional posts,