日照钢铁2×360 m2烧结机余热发电项目于是2010年月10月投产,至今已运行近两年。本文介绍了该项目的总体情况,包括:锅炉系统、汽水系统、烟风系统和汽轮机系统,以及项目投产后的生产状况。据生产统计,2010年6月~2011年5月该项目累计发电1.074×108kWh,累计上网7.346×107kWh,获利10 740.64万元,效益十分可观。此外,其节能、减排效果也很好。
Rizhao Iron and Steel 2 * 360 m2 sintering machine waste heat power generation project was put into operation in October 2010, has been running for nearly two years. This paper presents the general situation of the project, including: boiler system, steam and water system, smoke and steam turbine system, and the production status after the project is put into production. According to the production statistics, from June 2010 to May 2011, the project generated a total of 1.074 × 108kWh of electricity and accumulated a total of 7.346 × 107kWh on the Internet, generating a profit of 107.44 million yuan. The benefits are considerable. In addition, its energy-saving, emission reduction effect is also very good.