基于极限载荷试验的扩底抗拔桩承载变形特性的分析

来源 :岩土工程学报 | 被引量 : 0次 | 上传用户:bill119
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
结合天津于家堡南、北地下车库项目开展了2组各3根扩底抗拔桩的极限承载力试验,其中一组试桩有效桩长19 m,另一组试桩有效桩长30 m,试桩均加载至极限破坏状态。载荷试验过程中,两组试桩均对桩顶、有效桩长桩顶以及桩端位置进行了位移测试;其中有效桩长为19 m的试桩还开展了桩身轴力测试。对2组试桩成果从荷载位移曲线、桩身轴力分布、桩侧摩阻力分布规律等方面进行了分析。结合有限元数值模拟分析表明,扩底抗拔桩的承载力由等截面段桩侧摩阻力与扩大头抗力共同组成,首先由等截面段桩土侧摩阻力提供抗拔力;当上拔荷载进一步增大后,扩大头开始逐渐发挥作用,并且扩大头抗力占总承载力的比例逐步上升。极限状态下,有效桩长为19,30 m的试桩,扩大头提供的抗力占总抗拔承载力的比例分别约为50%和35%。扩大头的存在对于等截面段桩侧摩阻力的发挥影响较小。扩大头受周边土体法向力的竖向分量是扩大头抗力的主要组成部分,极限状态下,其可占扩大头抗力的70%左右。 The ultimate bearing capacity tests of 3 sets of 3 deep-grouted piles were carried out in combination with the north and south underground garage project at Yujiapu, Tianjin. The effective length of a group of test piles was 19 m, and the length of another group of test piles was 30 m. The test piles were loaded to the ultimate destruction state. During the load test, the displacement test was performed on the pile top, the effective pile long pile top and the pile end position in the two groups of test piles. The test pile with an effective pile length of 19 m was also tested for axial force of the pile body. The results of the two sets of test piles were analyzed from the aspects of load-displacement curve, distribution of axial force of the pile body, distribution law of pile friction resistance, and other aspects. Combining finite element numerical simulation analysis shows that the bearing capacity of the bottom-lift pile is composed of the friction resistance of the pile section and the expanding head resistance in the equal-section section. The friction resistance of the pile-soil side of the equal-section section is firstly provided; when the upper load is extracted After further increase, the expansion head gradually began to play a role, and the proportion of head resistance increased to the total carrying capacity gradually increased. In the limit state, the test piles with an effective pile length of 19,30 m have a resistance ratio of 50% and 35% respectively. The existence of an enlarged head has little effect on the frictional resistance of the pile section in the equal section section. Expanding the vertical component of the head by the normal forces of the surrounding soil is the main component of the expansion of the head resistance. In the limit state, it can account for about 70% of the head resistance.
其他文献
部分单侧雀斑样痣(Partial Unilateral Lentiginosis ,PUL)是一种少见的色素性疾病,文献中较少见有报道,临床上容易误诊,笔者在2005 年门诊诊断1 例合并同侧耳聋的PUL 患者,随
目的 系统评价Runt相关转录因子3(RUNX3)(rs760805)基因多态性与胃癌发病风险的相关性。方法 计算机检索数据库PubMed、EMbase、The Cochrane Library(2018年3期)、CMB、CNKI、VIP
:结合职业心理学、社会行动理论与大学生投入理论的洞见,提出“生涯定向清晰度”评估框架,同时考察大学生的生涯方向确定性和决策理性,并透过学生高影响力教育活动的投入来追溯其
采用溶液共混法制备聚对苯二甲酸丁二醇酯(PBT)/石墨烯(Gs)复合材料和PBT/表面功能化石墨烯(GSKH550)复合材料,并对PBT、PBT/GS复合材料、PBT/GS-KH550复合材料的性能进行研究。结果表明
本文重点介绍在日常工业生产过程中使用面最为广泛的电动式表压压力变送器和差压变送器(2MPa以内气体介质)的检定和调整过程,其中调整过程不仅包括检定规程规定的方法,还重点
目的系统评价RUNX3蛋白表达与胃癌及其不同临床病理特征的相关性。方法计算机检索PubMed、EMbase、VIP、WanFang Data和CBM,查找国内外公开发表关于RUNX3蛋白表达与胃癌及其
通过对5根相同断面,相同配筋率,翼缘采用再生粗骨料取代率依次为0%、30%、50%、70%及100%的再生混凝土,腹板采用普通混凝土制备的T形截面叠合梁的弯曲试验,研究了各梁的受弯
酒店行业的高速发展,带动了社会对酒店专业人才的需求.高职院校作为酒店服务人才主要输出机构,承担着为社会培育人才的重要责任.酒店行业的服务性质,使得相关人才培养中酒店
随着中学篮球运动的发展,各队水平的接近使比赛中减少传接球失误显得更为重要。它的成功与否,接影响各队的进攻情绪,关系到战术水平的能否正常发挥。因此,我针对中学生篮球传接球
目的分析新发涂阳肺结核患者就诊和诊断延误的影响因素,为制定减少延误发生的干预措施提供科学依据。方法采取典型调查的方法,在东、中、西部各选择1个县作为研究现场,采用编