论文部分内容阅读
摘要:渠道输水是我国农田灌溉的主要输水方式。但传统的土渠输水渗漏损失很大,每年渗漏的水量非常惊人。为保证农田渠道现浇混凝土防渗渠道的防渗效果和耐久性,本文对农田灌溉防渗渠道衬彻施工技术,包括施工预备、混凝土材料、混凝土配合比以及混凝土的浇筑等方面进行归纳总结,为以后农田灌溉防渗渠的施工提供理论基础。
关键词:农田灌溉,防渗渠道,施工技术,拆模,养护
Abstract: water irrigation channels in China is the main water delivery mode. But the traditional TuQu water leakage loss very big, every year of the leakage of water is very breathtaking. To ensure the farmland channel cast-in-situ concrete impervious effect of seepage control channels and durability, in this paper, the irrigation channel lining construction technology of seepage control Chester, including construction preparation, concrete materials, concrete mixture of concrete casting, etc., the paper summarizes the aspects in the future FangShenQu irrigation of construction to provide the theory basis.
Keywords: irrigation and seepage control channels, construction technology, dismantling formwork, maintenance
中图分类号:TV52文献标识码:A 文章编号:
前言
渠道防滲这项工程技术,在一定程度上能够减少渗漏的损失。渠道防渗节水的潜力比较大,是应优先考虑的重要技术之一。在节水灌溉工程建设的过程中,由于混凝土防渗渠道具有很好的防渗效果,能够有效地提高输水能力,具有减小渠道的断面尺寸和耐久性强的特点,在不同的地形、气候和使用条件的大中小型渠道和农业节水浇灌工程建设中得到了广泛的应用。
1.施工之前的预备工作
1.1渠道防渗工程施工前地基处理
渠道防渗工程在开始施工之前,应该对渠道进行施工放样,具体的放样尺寸,应严格按照设计图纸的要求进行。放样出渠道底脚线与渠口线共四条线,之后进行开挖,土方的开挖应该提前进行,使得地基土的水分在自然风干下尽量降低,以增强土基的强度,减轻冬季冻胀的破坏。
1.2模板工程
模板安装的时候需要按照图纸测量放样,对重要的结构应该多设置控制点,有助于检查校核工作的进行。模板一定要拼装严密、准确,模板不能漏浆,要求表面必须平整,不产生过大变形。现浇砼模板安装净距沿渠道纵向的答应偏差正负10毫米,沿宽度方向的答应偏差为正负30毫米。
2.施工时候选择的混凝土材料
2.1施工时对水泥的质量控制
在使用水泥的时候,必须区分水泥的品种和强度等级,熟练地掌握水泥的性能以及使用方法,根据工程的具体实际情况,合理地选择、使用水泥,提高工程质量的同时也节约水泥。在施工过程中还应注意优先使用散装水泥。
2.2施工时对水的质量要求
在水的选择上需要特别注意质量,并且有一定的相关要求,凡饮用的水、地表水、地下水都可以使用。严格禁止使用未经处理的工业废水、污水、沼泽水。
2.3施工时骨料的质量控制
2.3.1对骨料料场进行选择
骨料料场一定场地比较开阔,高程也要适宜,储量需要大些,对骨料的各项质量要求应该满足渠道混凝土,其储量尽量满足各个设计级配所需,并且应该有必要的富裕量。
2.3.2粗、细骨料的质量要求
粗骨料的质量要求:不应超过钢筋净距的2/3、构件断面最小边长的1/4、素混凝土板厚的1/2。对于少筋或无筋的混凝土结构,应该选用较大的粗骨料粒径。应由实验确定采用连续级配或间断级配,表面应该保持洁净。
细骨料的质量要求:细骨料应该质地坚硬、清洁、级配良好,人工砂的细度模数宜在2.4~2.8范围内,天然砂的细度模数宜在2.2~3.0范围内。使用山砂、粗砂、特细砂应该经过实验论证。
3.注意混凝土配合比
混凝土施工配合比,需要进行实验才能够确定,并且符合设计技术指标和施工要求,并经审批之后才可以使用。混凝土施工配料必须在经审核后才能签发,配料应该严格按签发的混凝土施工配料单进行,严禁对其擅自更改。
4.混凝土的浇筑
4.1浇筑前的预备作业
砂砾的地基应该清理杂物,整平建基面,在新混凝土浇筑之前,必须清楚老混凝土表面含游离石灰的水泥膜,形成有利于层间结合的麻面。纵缝表面必须冲洗干净,可以不凿毛,这样才能够对灌浆有利。
4.2入仓铺料
在浇筑混凝土之前,假如渠床干燥起土的话,应该对其进行洒水湿润,以避免浇筑好的砼板因水分过度地流失,而导致表面出现细裂纹。使用伸缩缝分块浇筑对混凝土衬砌渠道的进行施工,渠底、渠坡通常都使用跳仓浇筑。施工顺序的确定,以设计要求和施工的方便操作为依据,通常是先浇渠底,后浇渠坡,最后浇压顶,先浇得渠底衬砌板,可作为渠坡浇筑时的支承,成为其优点。
4.3平仓与振捣
混凝土平仓后振捣,不允许以振捣代替平仓,振捣时间混凝土粗骨料不再显著下沉,开始泛浆为准,应避免欠振或过振,使用平面振捣器振捣时,将混凝土按模板的高度,全部铺满仓面整平表面,就可以开始振捣。第一遍振实,移动速度要注意均匀,并且较慢,直至表面泛浆为止。第二遍振平,速度可以稍微快些,必要的时候可以使用人工振捣或插捣。浇筑渠底的时候,使用平面振捣器,等待整个仓面铺满料之后再进行振捣,直至表面泛浆为止。
4.4做好收面工作
收面工作要求做到表面平整光滑,无石子外漏,无蜂窝麻面。浇筑完混凝土立即用原浆进行收面,不得另外板砂浆收面,不得洒水收面。其工序是先用长木抹粗抹1遍,使表面平整,稍停,再用铁泥抹细抹1遍,最后待大量水分蒸发后,再用铁泥抹压抹1遍,直至达到密实,平整,光滑。
4.5混凝土初凝后拆模
混凝土浇筑后,待混凝土初凝后就可以进行拆模,拆模的时候必须要小心,不要使混凝土的结构受到影响。拆模的时候,应该把模板的一端轻轻地撬起,之后使用坚硬的物体在背面对其敲打,待其全部开始松动,从另一端取出。拆完后的模板应立即清理干净、整修,校核,注意平放以备以后使用。
4.6养护
混凝土的表面覆盖湿草帘、湿芦席是比较常用的方法。正常的气温下,混凝土浇筑后6到18小时 就可以进行养护,根据实用水泥和气温的不同,养护使用的时间长短也不同,养护要勤洒水,使混凝土表面保持湿润状态。另外,也可在混凝土的表面用塑料薄膜进行覆盖,为混凝土提供保温、保湿的环境,使混凝土的养护更加充分。
结语
总之,在节水灌溉工程建设的过程中,混凝土防渗渠道的防渗效果非常好,能够有效地提高输水能力,在水浇灌工程建设过程应该大力推广。
参考文献
[1] 王勇.农田灌溉防渗渠道衬砌施工技术[J].土木建筑学术文库(第15卷).2011.08.
[2] 孙成文.论农田灌溉防渗渠道衬砌施工技术[J].黑龙江科技信息.2011,07.
[3] 关瑜.农田灌溉防渗渠道衬砌施工技术[J].中国新技术新产品.2011,04.
[4] 杜彦明.浅论农田灌溉防渗渠道衬砌施工技术[J].民营科技.2011,06.
[5] 于娜,王影,任美丽,刘丹宾.简述农田灌溉防渗渠道衬砌施工技术[J].内蒙古水利.2012,01.
关键词:农田灌溉,防渗渠道,施工技术,拆模,养护
Abstract: water irrigation channels in China is the main water delivery mode. But the traditional TuQu water leakage loss very big, every year of the leakage of water is very breathtaking. To ensure the farmland channel cast-in-situ concrete impervious effect of seepage control channels and durability, in this paper, the irrigation channel lining construction technology of seepage control Chester, including construction preparation, concrete materials, concrete mixture of concrete casting, etc., the paper summarizes the aspects in the future FangShenQu irrigation of construction to provide the theory basis.
Keywords: irrigation and seepage control channels, construction technology, dismantling formwork, maintenance
中图分类号:TV52文献标识码:A 文章编号:
前言
渠道防滲这项工程技术,在一定程度上能够减少渗漏的损失。渠道防渗节水的潜力比较大,是应优先考虑的重要技术之一。在节水灌溉工程建设的过程中,由于混凝土防渗渠道具有很好的防渗效果,能够有效地提高输水能力,具有减小渠道的断面尺寸和耐久性强的特点,在不同的地形、气候和使用条件的大中小型渠道和农业节水浇灌工程建设中得到了广泛的应用。
1.施工之前的预备工作
1.1渠道防渗工程施工前地基处理
渠道防渗工程在开始施工之前,应该对渠道进行施工放样,具体的放样尺寸,应严格按照设计图纸的要求进行。放样出渠道底脚线与渠口线共四条线,之后进行开挖,土方的开挖应该提前进行,使得地基土的水分在自然风干下尽量降低,以增强土基的强度,减轻冬季冻胀的破坏。
1.2模板工程
模板安装的时候需要按照图纸测量放样,对重要的结构应该多设置控制点,有助于检查校核工作的进行。模板一定要拼装严密、准确,模板不能漏浆,要求表面必须平整,不产生过大变形。现浇砼模板安装净距沿渠道纵向的答应偏差正负10毫米,沿宽度方向的答应偏差为正负30毫米。
2.施工时候选择的混凝土材料
2.1施工时对水泥的质量控制
在使用水泥的时候,必须区分水泥的品种和强度等级,熟练地掌握水泥的性能以及使用方法,根据工程的具体实际情况,合理地选择、使用水泥,提高工程质量的同时也节约水泥。在施工过程中还应注意优先使用散装水泥。
2.2施工时对水的质量要求
在水的选择上需要特别注意质量,并且有一定的相关要求,凡饮用的水、地表水、地下水都可以使用。严格禁止使用未经处理的工业废水、污水、沼泽水。
2.3施工时骨料的质量控制
2.3.1对骨料料场进行选择
骨料料场一定场地比较开阔,高程也要适宜,储量需要大些,对骨料的各项质量要求应该满足渠道混凝土,其储量尽量满足各个设计级配所需,并且应该有必要的富裕量。
2.3.2粗、细骨料的质量要求
粗骨料的质量要求:不应超过钢筋净距的2/3、构件断面最小边长的1/4、素混凝土板厚的1/2。对于少筋或无筋的混凝土结构,应该选用较大的粗骨料粒径。应由实验确定采用连续级配或间断级配,表面应该保持洁净。
细骨料的质量要求:细骨料应该质地坚硬、清洁、级配良好,人工砂的细度模数宜在2.4~2.8范围内,天然砂的细度模数宜在2.2~3.0范围内。使用山砂、粗砂、特细砂应该经过实验论证。
3.注意混凝土配合比
混凝土施工配合比,需要进行实验才能够确定,并且符合设计技术指标和施工要求,并经审批之后才可以使用。混凝土施工配料必须在经审核后才能签发,配料应该严格按签发的混凝土施工配料单进行,严禁对其擅自更改。
4.混凝土的浇筑
4.1浇筑前的预备作业
砂砾的地基应该清理杂物,整平建基面,在新混凝土浇筑之前,必须清楚老混凝土表面含游离石灰的水泥膜,形成有利于层间结合的麻面。纵缝表面必须冲洗干净,可以不凿毛,这样才能够对灌浆有利。
4.2入仓铺料
在浇筑混凝土之前,假如渠床干燥起土的话,应该对其进行洒水湿润,以避免浇筑好的砼板因水分过度地流失,而导致表面出现细裂纹。使用伸缩缝分块浇筑对混凝土衬砌渠道的进行施工,渠底、渠坡通常都使用跳仓浇筑。施工顺序的确定,以设计要求和施工的方便操作为依据,通常是先浇渠底,后浇渠坡,最后浇压顶,先浇得渠底衬砌板,可作为渠坡浇筑时的支承,成为其优点。
4.3平仓与振捣
混凝土平仓后振捣,不允许以振捣代替平仓,振捣时间混凝土粗骨料不再显著下沉,开始泛浆为准,应避免欠振或过振,使用平面振捣器振捣时,将混凝土按模板的高度,全部铺满仓面整平表面,就可以开始振捣。第一遍振实,移动速度要注意均匀,并且较慢,直至表面泛浆为止。第二遍振平,速度可以稍微快些,必要的时候可以使用人工振捣或插捣。浇筑渠底的时候,使用平面振捣器,等待整个仓面铺满料之后再进行振捣,直至表面泛浆为止。
4.4做好收面工作
收面工作要求做到表面平整光滑,无石子外漏,无蜂窝麻面。浇筑完混凝土立即用原浆进行收面,不得另外板砂浆收面,不得洒水收面。其工序是先用长木抹粗抹1遍,使表面平整,稍停,再用铁泥抹细抹1遍,最后待大量水分蒸发后,再用铁泥抹压抹1遍,直至达到密实,平整,光滑。
4.5混凝土初凝后拆模
混凝土浇筑后,待混凝土初凝后就可以进行拆模,拆模的时候必须要小心,不要使混凝土的结构受到影响。拆模的时候,应该把模板的一端轻轻地撬起,之后使用坚硬的物体在背面对其敲打,待其全部开始松动,从另一端取出。拆完后的模板应立即清理干净、整修,校核,注意平放以备以后使用。
4.6养护
混凝土的表面覆盖湿草帘、湿芦席是比较常用的方法。正常的气温下,混凝土浇筑后6到18小时 就可以进行养护,根据实用水泥和气温的不同,养护使用的时间长短也不同,养护要勤洒水,使混凝土表面保持湿润状态。另外,也可在混凝土的表面用塑料薄膜进行覆盖,为混凝土提供保温、保湿的环境,使混凝土的养护更加充分。
结语
总之,在节水灌溉工程建设的过程中,混凝土防渗渠道的防渗效果非常好,能够有效地提高输水能力,在水浇灌工程建设过程应该大力推广。
参考文献
[1] 王勇.农田灌溉防渗渠道衬砌施工技术[J].土木建筑学术文库(第15卷).2011.08.
[2] 孙成文.论农田灌溉防渗渠道衬砌施工技术[J].黑龙江科技信息.2011,07.
[3] 关瑜.农田灌溉防渗渠道衬砌施工技术[J].中国新技术新产品.2011,04.
[4] 杜彦明.浅论农田灌溉防渗渠道衬砌施工技术[J].民营科技.2011,06.
[5] 于娜,王影,任美丽,刘丹宾.简述农田灌溉防渗渠道衬砌施工技术[J].内蒙古水利.2012,01.