广佛江快速通道江顺大桥主桥为双塔双索面的钢-混混合梁斜拉桥,主跨700m,双向六车道,箱梁全宽39m,是目前广东省第一大跨斜拉桥,该桥采用无应力状态控制法进行施工监控,边跨合龙施工存在难度,综合考虑合龙环境温度变化、钢箱梁顶底板温差及现场实际情况等因素,边跨采用配切合龙法施工。以该桥主桥钢箱梁顺岸边跨合龙为例,对边跨合龙的控制思路和合龙方案进行论述,重点介绍边跨合龙的施工步骤和细节。
Guangfo Expressway The main bridge of Jiangshun Bridge is a steel-concrete hybrid cable-stayed bridge with twin towers and double cable planes. The main span of the bridge is 700m with two-way six lanes and a total width of 39m. It is the first span cable-stayed bridge in Guangdong Province, The bridge is under stressless state control method for construction monitoring. It is difficult to construct the side cross-over and drag-in construction. Considering factors such as the change of clogging environment temperature, the temperature difference between the top and bottom of the steel box girder and the actual situation on site, Taking the cross-linking of the steel box girder along the bank of the main bridge as an example, the control ideas and closing schemes of the cross-linking and cross-linking are discussed. The construction steps and details of cross-linking are emphasized.