惠济河李滩闸是惠济河上游主工拦河节制闸,属中型闸,设有交通桥,闸门为反向双曲扁壳钢筋混凝土闸门,电动卷扬机启闭,消力池消能改建过程中,需要从改建的前期工作、建设施工期、及运行管理期等各阶段进行全过程、全面的质量管理。文章详细介绍了惠济河李滩闸详细情况,以及改建过程,并分析全过程质量管理的重要作用,为其他建设工程质量管理提供参考。
Huijihe Li Tan Gate is the main river upstream Huiji River Barrier, is a medium-sized gate, with a traffic bridge, the gate is the reverse hyperbolic flat-shell reinforced concrete gate, electric windlass hoist, energy dissipating pool reconstruction In the process, it is necessary to carry out the whole process and overall quality management from the previous stage of reconstruction, the construction and construction period, and the operation and management period. The article details the details of Li-tai gate of Huiji River, as well as the reconstruction process, and analyzes the important role of quality management in the whole process to provide references for the quality management of other construction projects.