自平衡试桩法和锚桩法都是桩基测试中的静载试验方法,但是二者在加载位置处有着明显的区别。以青岛海湾大桥试桩的自平衡试验和锚桩法静载荷试验结果,对两种测试方法的荷载-位移曲线、桩身轴力、桩侧摩阻力、桩端阻力进行了比较。研究表明:自平衡试桩法与常用的锚桩法相比,具有设备简单、节省费用、节约工期等特点。从测试结果来看,两者的荷载-位移曲线比较接近,但是由于加载位置的不同桩身轴力分布图则完全不同;从桩侧摩阻力来看,荷载箱上部的极限侧摩阻力偏小,而荷载箱下部的极限侧摩阻力偏大;从桩端阻力分担比例来看,自平衡试桩法中桩端阻力所占比例高于传统的锚桩法,在桩基设计时应予以考虑。
The self-balance test method and the anchor test method are both static load test methods in pile foundation test, but there is a clear difference between the two at the loading position. Based on the self-balance test of the Qingdao Bay Bridge test pile and the static load test results of the anchor pile method, the load-displacement curves, the axial force of the pile body, the frictional resistance of the pile side and the pile end resistance were compared. The research shows that compared with the commonly used anchor pile method, the self-balancing test pile method has the characteristics of simple equipment, saving costs and saving construction period. From the test results, the load-displacement curve of the two is relatively close, but due to the different axial load distribution of the pile body load distribution is completely different; from the pile side of the frictional resistance, the load box upper side of the friction on the side of the small , While the load on the lower limit of the side of the skin friction is too large; from the share of the end of the pile resistance ratio, self-balancing pile test method in the proportion of the proportion of resistance than the traditional anchor piles, pile foundation design should be considered .