论文部分内容阅读
通过堵、引、排、调、改等综合措施,控制临海深基坑坑壁的渗漏水、砂层涌水及工程桩出水,确保了工程施工的安全。
Through the integrated measures of blocking, drawing, discharging, adjusting and changing, etc., the seepage water, sand gushing water and engineering pile outlet in the deep foundation pit of Linhai are controlled to ensure the safety of construction.