论文部分内容阅读
项目基本情况:借款人MIREASA ENERGIES S.R.L成立于2006年8月10日,注册地为罗马尼亚,公司经营范围包括发电、供电及电力交易。本项目位于罗马尼亚Constanta市东南50公里处,是该国风资源最优地段。项目拟建设50MW的风电场,计划采用20台金风科技GW100/2500机组(100m塔架),建成后电力送入场内升压站(1台63MVA主变)。本项目所采用的金风科技GW100/2500风力发电机组,在国内外已有广泛的应用,技术较为成熟,已具备欧盟要求的CE认证。
Project Profile: The borrower MIREASA ENERGIES S.R.L was established on August 10, 2006 and is registered in Romania. The business scope of the company includes power generation, power supply and electricity trading. The project is located 50 kilometers southeast of Romania’s Constanta City and is the best section of the country’s wind resources. The project plans to build a 50MW wind farm and plans to use 20 Goldwind GW100 / 2500 units (100m tower). After the project is completed, the electricity will be sent to the site booster station (a 63MVA main transformer). The Goldwind GW100 / 2500 wind turbine used in this project has been widely applied both at home and abroad. The technology is relatively mature and already has the CE certification required by the EU.