结合涡阳涡河大桥主桥承台吊箱施工,提出在修建高桩承台时,受到标高控制情况下,必须减薄封底混凝土厚度所采取的措施
Combined with the construction of the main pylons of Guoyang River Bridge, this paper puts forward the measures that must be taken to reduce the thickness of concrete at the end of piles under the elevation control