论文部分内容阅读
美国华盛顿州格兰特县公共设施管理区根据其优先保护鱼类和提高水电设施效率的基本原则,目前正在瓦纳普姆(Wanapum)坝安装一个创新的过鱼旁通槽,以及设计先进的亲鱼水轮机。这项工作是瓦纳普姆坝目前正在实施的重要改造计划的组成部分;对下游的普里斯险滩(PriestRapids)坝已规划了类似的水轮机改造工程。
Grant County, Washington Public Utilities Management District Based on its basic principle of prioritizing fish conservation and improving efficiency of hydropower facilities, an innovative overpassed bypass tank is being installed at the Wanapum Dam, as well as designing advanced broodstock turbines . This work is part of a major renovation program currently underway at Vanapat Dam; similar turbine modifications have been planned for the Lower Priest Rapids dam.