<正> We designed a new tuning system for SFC D circuit. It is a device to carry out auto tuning.D circuit consists of cavity and D-model box, it is an important
<正>Considerable progress of HIRFL-CSR project was achieved in 2004. Up to now, about 98% of the total components have been completed, tested and installed. The
<正>1. HIRFL Operation HIRFL accelerator complex was fully in operation in 2004. The main cyclotron SSC has been operated since July, 2004 after some time shut-