论文部分内容阅读
水电站装机容量的选择直接关系到该河段的水能开发利用,关系到投资者的付出与收益。一个水电站合理的装机容量的确定不仅与电站装机、发电量有关,还与电站的投资等因素有关。本论文结合双龙电站装机容量的确定过程,分析单位电能投资最小法在确定北方小型水电站装机容量中的优势,为北方小型水电站装机容量的确定提供理论依据。
The choice of hydropower installed capacity is directly related to the development and utilization of water energy in the reach of the river, which is related to the contribution and profit of investors. A hydropower station to determine a reasonable installed capacity not only with the power station installed capacity, power generation, but also with the power station investment and other factors. Combined with the determination of installed capacity of Shuanglong Hydropower Station, this paper analyzes the advantages of the minimum unit investment of electric energy in determining the installed capacity of northern small hydropower stations, and provides a theoretical basis for determining the installed capacity of northern small hydropower stations.