1986年3月,全国100个农村电气化试点县工作会议之后,试点县工作有了较大发展,主要表现在以下几方面:1.电源装机进展较快。到1987年上半年止,试点县累计完成发电装机190.2万千瓦,为规划的62.5%,包括在建电站68.22万千瓦,共计258.42万千瓦,为规划的85.1%。在初级农村电气化标准的目标管理下,电源建设逐步扭转了过去径流式电站过多的问题,增建了一些龙头水库及有调节能力的电站,并在有条件的地
In March 1986, after the work conference of 100 rural electrification pilot counties across the country, the work in the pilot counties had made great progress, mainly in the following aspects: 1. Power installation progressed faster. By the end of the first half of 1987, the pilot counties had completed 1.902 million kilowatts of power generation capacity, which is 62.5% of the plan, including 682,200 kilowatts of power plants under construction, with a total of 2,584,200 kilowatts, which is 85.1% of the plan. Under the objective management of the primary rural electrification standard, power supply construction has gradually reversed the problem of excess runoff power stations in the past, and additional leading reservoirs and power plants with adjustable capacity have been built, and conditions have been met.