Progress in China Experimental Fast Reactor

来源 :Annual Report of China Institute of Atomic Energy | 被引量 : 0次 | 上传用户:az4620
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
China Experimental Fast Reactor(CEFR) power experiment is designed to validate that its performance can meet the requirements of design in the expected transient operating conditions and stable operating conditions.In the power experiment stage,tests should be carried out in normal condition and accident condition simulation.CEFR achieved the 40%P_n power generation under the condition of stable operation for 24 hours.Since July,2011,after the objective to acceptance of national requirements was achieved,the reactor was shutdown and the inspection repair was started.On March 14,2014,the reactor was started up again to continue to cany out the phase C trial.On December 15.2014.for the first time the reactor reached full power operation,the reactor was shut down again after achieved continuous operation at full power for 72 hours which was the annual target.The total operation time of CEFR reached 1156 hours.During this period,7 main tests,2 research tests and the 20 tests with the power test were earned out. China Experimental Fast Reactor (CEFR) power experiment is designed to validate that its performance can meet the requirements of design in the expected transient operating conditions and stable operating conditions. In the power experiment stage, tests should be carried out in normal condition and accident condition simulation .CEFR achieved the 40% P_n power generation under the condition of stable operation for 24 hours .ince July, 2011, after the objective to acceptance of national requirements was achieved, the reactor was shutdown and the inspection was started. On March 14 , 2014, the reactor was started up again to continue to cany out the phase C trial. On December 15.2014. For the first time the reactor reached full power operation, the reactor was shut down again after achieved continuous operation at full power for 72 hours which was the annual target. The total operation time of CEFR reached 1156 hours. During this period, 7 main tests, 2 research tests and the 20 tests with the power test were earned out.
其他文献
The CAP1400,large-scale advanced PWR demonstration project,will be built by our country,after the innovation work on the imported technology of AP1000.During it
Nuclear grade cable is one of the key components that relate to the NPP safety operation,long-term thermal and y radiation simultaneous ageing is the key factor
二○一三年十一月十三日杨府办发〔2013〕30号区政府各委、办、局,各街道办事处、五角场镇政府:经区政府同意,现将区创新办、区科委、区财政局、区金融办、区海外人才中心制
“Research on new domestic zircaloy safety performance under LOCA conditions”is a research program started from the year of 2013,the objectives of the research
The contract“loading,transportation and hot cell examination of fuel rods”were signed between China Institute of Atomic Energy(CIAE)and CGN Nuclear Power Plan
《花千骨》《琅琊榜》《芈月传》等现象级大剧火后,根据电视剧开发的手游作为它们的周边衍生品也发展得几家欢喜几家愁,在IP大剧遍地开花的当下,“影游联动”不是热词,但它的
Experiments of~3He release from LaNi_(4.25)Al_(0.75)materials which aged for 3 years are made byusing ultravacuum metal system and metal leak which is designed
2012年8月,张继科在伦敦奥运会上收获单打、团体两枚金牌,以445天的最快速度完成了乒坛的最高理想——大满贯。如果说在伦敦奥运周期里,2011年鹿特丹世乒赛夺冠后的张继科是
上方是高温的工件表面,下方是温度约为介质沸点的液面。因此,水平向下表面蒸汽膜内气体温度分布的特点是:上方高,而下方低。这样的温度分布使气体之间不可能发生自发的对流。
CEFR nuclear instrumentation system(NIS),which monitors the power safety of CEFR viapower protection and period protection,plays a vital role in reactor protect