打磨岗烟草水源工程大坝为碾压混凝土重力坝,为了更好的完成施工,保证施工质量,通过碾压混凝土碾压试验,获得准确的碾压参数,同时检验了施工过程中各系统设备运行的可靠性和配套性,确定了特殊部位施工方法,最终确定了施工工艺和施工参数,为碾压混凝土现场施工提供了依据,取得了较好的效果。
In order to better complete the construction and ensure the construction quality, the dam of Grinding post and water source dam is a roller compacted concrete gravity dam. The accurate roller compaction parameters are obtained through the roller compaction test of RCC, and the operation of each system during the construction process The reliability and matching of the construction site, the construction method of the special site was determined, and the construction technology and construction parameters were finalized, which provided the basis for the RCC construction and achieved good results.