论文部分内容阅读
该文以洪范池铁矿为例,在综合分析了矿区地质、水文地质特征的基础上,研究了矿坑充水水源、充水通道等充水因素。采用地下水动力学法及地下水动力学法和解析法相结合的方法预测了矿坑涌水量,并对其结果进行了对比。该文为矿山企业解决铁矿生产面临的水害问题提供了很好的参考。
Taking the Hongfanchi iron mine as an example, this paper studies the geological conditions and hydrogeological features of the mining area, and studies the water filling factors such as the water source and the water filling channel in the pit. Groundwater dynamic method and groundwater hydrodynamics and analytical methods are combined to predict the amount of water in the pit, and the results are compared. This article provides a good reference for mining enterprises to solve the water hazard problem in iron ore production.