2001年7月肯尼科特(Kennecott)闪速吹炼炉按计划停炉以实施设计改进,增强炉子完整性。新设计有以下特点:重新设计了所有的侧壁冷却元件,包括Hatch的冷却元件最新设计技术;重新设计了炉膛,包括炉子反应塔端部的运动场型炉膛和靠近炉子侧壁的台阶式炉膛;在反应塔周围增加了沉淀池顶平冷却元件;反应塔过渡元件换成新设计元件并改进了炉子冷却元件监控系统。总结了停炉以后所做的这些改进并给出了冶炼厂性能的最新数据。
July 2001 Kennecott Flash Furnace Shutdown on schedule to implement design improvements to enhance furnace integrity. The new design has the following features: Redesigned all the cooling elements on the side wall, including the latest design technology of Hatch cooling elements; redesigned furnace, including the stadium-type hearth at the end of the furnace reaction tower and the stepped furnace near the furnace sidewall; Sedimentation tank top flat cooling elements were added around the reaction column; the reaction column transition elements were replaced with new design elements and the furnace cooling element monitoring system was improved. The improvements made after the shutdown were summarized and the latest data on smelter performance are given.