论文部分内容阅读
荆门1000千伏变电站位于湖北省荆门市沙洋县沈集镇,远期总占地面积约29公顷,本期总占地面积约16.6公顷,总建筑面积3025平方米。
Jingmen 1000-kilovolt transformer substation is located in Shenji Town, Shayang County, Jingmen City, Hubei Province. The long-term total site area is about 29 hectares. The current total site area is about 16.6 hectares and the total construction area is 3025 square meters.