论文部分内容阅读
提出水电站仿真培训系统仿真模型的建立应面向全站、全过程、全范围,这是由水电站仿真培训系统的功能特点所决定的。同时为了达到仿真实时性的要求,结合国家电力公司重点实验室建设项目——大型水电站仿真培训系统研制,探讨了水电站实时仿真模型的建模特点,重点讨论了仿真主体实时仿真模型和继电保护系统实时仿真模型的建立
It is proposed that the establishment of the simulation model of the hydropower station simulation training system should be aimed at the whole station, the entire process and the entire scope, which is determined by the functional characteristics of the hydropower station simulation training system. At the same time, in order to meet the requirements of real-time simulation, combined with the State Key Laboratory of Power Company construction project - the development of large-scale hydropower station simulation training system, discussed the real-time simulation model of hydropower station modeling features, focusing on the simulation of the real-time simulation model and relay protection Establishment of real-time system simulation model