大孤山露天铁矿,台阶高度12米,坚硬的磁铁矿与花岗岩占多数,属难爆矿岩。为解决爆破震动对矿区周围居民房屋的影响问题,曾先后改齐发爆破为孔内延期排间微差爆破,以及地面延期控制微差爆破。1982年又改用非电毫秒雷管和连结套,实现了无限段的微差控制爆破,可明显改善爆破质量与降震效果。鉴于其网路布设、传爆顺序和国内外矿山有所不同,校本文称之为大孤山起爆顺序。
Dagushan open-pit iron mine, the step height of 12 meters, the hard magnetite and granite majority, is a hard rock ore. In order to solve the impact of blasting vibration on residents’ houses around the mining area, it has successively changed the Qifa blasting to the microtrack blasting in the delayed post-mortem and the microtactic blasting on the ground postponed. In 1982, the non-electric millisecond detonator and the connecting sleeve were used instead, which realized the infinitely-controlled differential-mode blasting, which can obviously improve the blasting quality and the earthquake-resistant effect. In view of its network layout, explosion order and mines at home and abroad are different, the school text called Dagushan initiation order.