论文部分内容阅读
移民是水库工程建设的重要组成部分,水库淹没实物指标调查又是整个移民工作的开端和基础,移民工作能否顺利进行,关键要看水库淹没实物指标调查工作是否扎实,是否为下一步的规划编制和搬迁打下了良好的基础。本文结合燕山水库移民实物指标调查工作的实践,谈几点看法:1 组织要精心严密,安排要统筹到位燕山水库是国务院治淮工作会议后河南省第一项新开工的大型水利建设项目。该水库位于淮河最大的支流沙颍河之上游,工程建成后,将有效解决澧河河道现有防洪标准偏低,下游
Resettlement is an important part of the reservoir construction. The inundation survey of physical indicators of reservoirs is the beginning and foundation of the entire resettlement work. Whether the resettlement work can proceed smoothly depends on whether the in-depth investigation of inundation indicators of the reservoir is solid and whether it is the next step of planning Preparation and relocation laid a good foundation. In this paper, Yanshan Reservoir immigrants physical indicators of the investigation work, to talk about a few observations: 1 organization should be meticulous, arrangements should be coordinated Yanshan Reservoir is the State Council to work after the Huaihei Conference in Henan Province to start the first large-scale water conservancy projects. The reservoir is located in the upper reaches of the Shaying River, the largest tributary of the Huaihe River. After completion of the project, the reservoir will effectively solve the existing low flood control standards in the Taohe River,