论文部分内容阅读
深圳市铁路高架桥是我国首次在铁路上应用部分预应力混凝土结构的双线桥梁,该桥全长860.52m,每线由各自独立的梁、墩组成。全桥(两条正线和一条长137.19m机务整备
Shenzhen Railway Viaduct is the first double-track bridge in our country to use partially prestressed concrete structure on railway. The bridge is 860.52m in length, and each lane is composed of independent beams and piers. Full bridge (two positive lines and a long 137.19m machine maintenance