论文部分内容阅读
某广场地下室南临江边仅13m,基坑开挖深达10.5m,且场区范围存在较厚砂层,其深基坑支护设计与施工有一定难度,文中介绍其设计与施工过程,为临江工程的施工提供参考。
The ground floor of a square in the basement is only 13m to the waterfront in the south, with a depth of 10.5m for excavation and a thick sand layer in the field area. The design and construction of deep foundation pit support are somewhat difficult. The design and construction process, Provide a reference for the construction of Linjiang project.