建筑工程造价预结算审核工作要点探究

来源 :经贸实践 | 被引量 : 0次 | 上传用户:dinc22222
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
建筑的工程造价预结算审核关系到预结算的准确性,也关系到工程项目成本控制的效果。预结算的审核评价能够反映出工程成本控制存在的问题,对工程项目费用支出管理有指导作用,利于建筑工程单位整改费用问题。因此,本文简述了预结算审核的要点,并分析造价审核中存在的问题,并提出了几点对策,推动工程造价预结算审核工作的开展。 Construction project cost pre-settlement audit related to the accuracy of pre-settlement, but also related to the project cost control effect. The audit and evaluation of pre-settlement can reflect the problems existing in the project cost control, and play a guiding role in the expenditure and expenditure management of construction projects, which is conducive to the rectification and reform of construction projects. Therefore, this article briefly describes the main points of pre-audit, and analyzes the problems existing in the audit of the cost, and puts forward some countermeasures to promote the project cost pre-audit work.
其他文献
高支模方案编制是一个专业性很强的工作,要求工程技术人员不仅熟悉高支模相关规范,还要具备良好的力学、工程学知识,在方案编制时能够全面考虑问题,为项目安全顺利实施保驾护
园林施工管理是园林施工质量的重要保证,并且本文通过对园林施工过程中存在的问题进行分析,并进行探讨。 Garden construction management is an important guarantee of ga
随着科技水平的不断提高,城市化进程不断推进,建设行业也在这一过程中得到了迅速发展,越来越多的工程项目被提到了日程,但随之而来的建筑结构裂缝问题成为了阻碍建筑业发展的
型材保护膜是用于型材可视面防护的一种印刷软包装产品,能起到商标标识和保护型材表面不被划伤的作用。它就像型材的一件防护衣,是型材生产必不可少的一部分。薄薄的一层膜,
曾经被很多中外游客视为老北京文化活化石的老字号店铺,如今在年长一辈的津津乐道中却夹杂些许叹息。而在更多的80后、90后新生代眼中,却是陈旧、落伍的同义词。面对如此窘境,老字号企业怎么在如今的电商时代下生存和发展?试水“互联网+”能不能让老字号重振雄风?  老字号辉煌不再  北京老字号拥有响亮的招牌、悠久的历史和深厚的文化底蕴。在皇城根下历经几十年甚至上百年的风雨仍旧屹立不倒。而东城区更是各类老字号
衡水市区地下水位埋藏浅、分布有饱和粉(砂)土地层,在长螺旋钻孔泵压混凝土桩施工过程中,易产生窜孔、缩径、充盈系数过大等现象,严重时液化区域相互贯通,造成地面沉降,对成
随着工业化发展进程的推进,能源的开采与环境保护之间的矛盾越来越严重,如何协调开发资源带来的经济发展和环境问题成为人们关注的又一大课题。文章以准格尔旗为例,分析水土
随着我国经济的的不断发展,对于各种建筑的要求也就越来越高。暖通技术是我国建筑行业最常用的技术,但是就我国目前的暖通技术能力来看,还存在一定的问题。据此,本文作者结合
137 Cs is an artificial radionuclide with a half-life of 30.2 years,which was released into the environment as a byproduct of atmospheric testing of nuclear wea
《建设工程招投标与合同管理》是工程管理类专业的必修课程,其内容涉及到相关专业学生在实际工作的具体工作,因此具有强烈的现实意义,有效的教学有助于学生学习掌握实际工程