论文部分内容阅读
为贯彻落实今年2月温家宝总理“坚持不懈抓好煤矿瓦斯防治工作,务求取得明显成效”的重要批示精神,煤矿瓦斯防治部际协调领导小组专题研究了煤矿瓦斯防治工作思路。“十一五”期间,煤矿建设以整合为主、新建为辅,优先安排建设千万吨级的特大型露天煤矿和现代化的大型井工矿,鼓
In order to implement the important directives of Premier Wen Jiabao on “persistently grasping the coal mine methane prevention and control work in February this year, with a view to achieving significant results,” the leading group on inter-ministerial coordination in coal mine methane prevention and control conducted a special study on the train of thought for coal mine methane prevention and control. During the “11th Five-Year Plan” period, the construction of coal mines will mainly be based on integration and new construction will be supplemented. Priority will be given to the construction of 10-million-tonne large open-pit coal mines and large-scale modern mines and drums