论文部分内容阅读
摘 要:发电机是风力发电系统中的核心关键部件,该文主要以湘电集团1.5MW SKYFF1500-4型电机为参考,依据国标要求,介绍双馈异步电机的试验方案及具体操作。通过试验全面考察风力电机的各种性能,判断电机的各项技术条件和参数是否满足国家规定以及客户设计性能的要求,也为设计部门改进电机性能,提高电机质量的可靠性提供试验数据参考和依据。
关键词:双馈异步风力发电机 ABB变频器 电机试验 发电系统
中图分类号:TM315 文献标识码:A文章编号:1672-3791(2020)11(a)-0060-04
Test Method for Doubly Fed Induction Generator
TAN Xiaohua1 TAN Xinbo2
(1. Tianjin University of Technology and Education, Tianjin, 300222 China; 2. Special Electrical Division, Xiangdian Group, Xiangtan, Hunan Province, 411101 China)
Abstract: Take the 1.5MW SKYFF1500-4 motor of XENC as an example, the test methodology of doubly fed induction Generator is introduced according to the national standard requirements in this paper, the purpose of the experiment is to investigate the performance of the motor, determine whether the technical conditions and parameters meet the requirements of the state regulations and the requirements of the customers. It also provides the reference and basis for the design department to improve the performance and reliability of the motor.
Key Words: Doubly fed induction generator; ABB inverter; Motor test; Power generation system
我国风能资源丰富,合理科学利用风力资源,能解决能源紧缺及环境污染等问题。风力发电机利用风力带动风车叶片旋转,通过齿轮增速机提高转速,从而带动发电机发电把风能转化成电能。发电机是风力发电系统中的核心关键部件,直接关系到风场发电的效率以及风力发电的质量。随着国家大力发展风力发电,风力发电机的质量和可靠性越来越受重视。
风力发电机中应用最为广泛的是双馈异步发电机,是一种绕线式转子电机。由于其定、转子都能向电网馈电,故简称双馈电机。为适应风力发电机市场需求,湘电集团成功研发了多种型号的双馈异步风力发电机,该文主要以1.5MW SKYFF1500-4型电机为参考,介绍双馈异步电机的试验方案。
1 双馈风力发电机的试验项目
双馈异步电机的试验分为型式试验和出厂试验。型式试验的目的就是全面考察被试验的电机各种性能,判断电机的各项技术条件和参数是否满足国家规定及客户设计性能的要求,也为设计部门改进电机性能,提高电机质量的可靠性提供试验数据参考和依据。出厂试验是在型式试验的基础上,进行满足客户要求的试验项目。型式试验包含有出厂试验的试验项目。
1.1 试验前的准备
(1)查看电机是否正确耦合在试验台位上,联轴器防护罩是否装好,被试验电机是否设立安全警示标志。
(2)检查电机本身送试状态是否合格,是否挂送试卡,检查电机各种配件是否已经装配好,查看滑环室是否有异物等。
(3)用双惠电桥测量电机直流冷态电阻与绝缘电阻。测量电机各铂热电阻是否良好,检查记录冷态下铂热电阻温度值,以及用500 MΩ摇表测量其绝缘性。
(4)用1000 MΩ摇表测量电机的绝缘性,定转子的绝缘电阻必须不低于500 MΩ。
(5)电机接线,并确认接线正确,测试电机冷却器转向是否正确。
1.2 电机温升试验
温升是指电子电气设备中的各个部件高出环境的温度。双馈风力发电机的温升试验包括额定温升试验、过载温升试验以及等效温升试验等,用于判断发电机在不同状態下,电机的散热情况、电机的运行状况、电机轴承运行情况等。是双馈电机试验的一种非常重要项目。该文主要以ABB ACS800-67变频器和异步发电机组成的试验平台,简单介绍1.5 MW异步双馈电机的温升试验。试验前须根据试验原理图,在双馈风力发电机试验操作界面上合上QF1、KM7,检查拖动机风机与风力发电机风机转向是否正确。
1.2.1 拖动机启动和调节
在双馈风力发电机试验操作界面上,启动后设定转速为500 r(风力发电机伸端逆时针转)或-500 r(风力发电机伸端顺时针转),拖动机开始转动,等实际转速达到设定转速时方可继续升速或降速,空载时每次调节转速最大不超过500 r(注意先启动变频器,在设定转速启动拖动机,以免启动电流过大,损害变频器)。
关键词:双馈异步风力发电机 ABB变频器 电机试验 发电系统
中图分类号:TM315 文献标识码:A文章编号:1672-3791(2020)11(a)-0060-04
Test Method for Doubly Fed Induction Generator
TAN Xiaohua1 TAN Xinbo2
(1. Tianjin University of Technology and Education, Tianjin, 300222 China; 2. Special Electrical Division, Xiangdian Group, Xiangtan, Hunan Province, 411101 China)
Abstract: Take the 1.5MW SKYFF1500-4 motor of XENC as an example, the test methodology of doubly fed induction Generator is introduced according to the national standard requirements in this paper, the purpose of the experiment is to investigate the performance of the motor, determine whether the technical conditions and parameters meet the requirements of the state regulations and the requirements of the customers. It also provides the reference and basis for the design department to improve the performance and reliability of the motor.
Key Words: Doubly fed induction generator; ABB inverter; Motor test; Power generation system
我国风能资源丰富,合理科学利用风力资源,能解决能源紧缺及环境污染等问题。风力发电机利用风力带动风车叶片旋转,通过齿轮增速机提高转速,从而带动发电机发电把风能转化成电能。发电机是风力发电系统中的核心关键部件,直接关系到风场发电的效率以及风力发电的质量。随着国家大力发展风力发电,风力发电机的质量和可靠性越来越受重视。
风力发电机中应用最为广泛的是双馈异步发电机,是一种绕线式转子电机。由于其定、转子都能向电网馈电,故简称双馈电机。为适应风力发电机市场需求,湘电集团成功研发了多种型号的双馈异步风力发电机,该文主要以1.5MW SKYFF1500-4型电机为参考,介绍双馈异步电机的试验方案。
1 双馈风力发电机的试验项目
双馈异步电机的试验分为型式试验和出厂试验。型式试验的目的就是全面考察被试验的电机各种性能,判断电机的各项技术条件和参数是否满足国家规定及客户设计性能的要求,也为设计部门改进电机性能,提高电机质量的可靠性提供试验数据参考和依据。出厂试验是在型式试验的基础上,进行满足客户要求的试验项目。型式试验包含有出厂试验的试验项目。
1.1 试验前的准备
(1)查看电机是否正确耦合在试验台位上,联轴器防护罩是否装好,被试验电机是否设立安全警示标志。
(2)检查电机本身送试状态是否合格,是否挂送试卡,检查电机各种配件是否已经装配好,查看滑环室是否有异物等。
(3)用双惠电桥测量电机直流冷态电阻与绝缘电阻。测量电机各铂热电阻是否良好,检查记录冷态下铂热电阻温度值,以及用500 MΩ摇表测量其绝缘性。
(4)用1000 MΩ摇表测量电机的绝缘性,定转子的绝缘电阻必须不低于500 MΩ。
(5)电机接线,并确认接线正确,测试电机冷却器转向是否正确。
1.2 电机温升试验
温升是指电子电气设备中的各个部件高出环境的温度。双馈风力发电机的温升试验包括额定温升试验、过载温升试验以及等效温升试验等,用于判断发电机在不同状態下,电机的散热情况、电机的运行状况、电机轴承运行情况等。是双馈电机试验的一种非常重要项目。该文主要以ABB ACS800-67变频器和异步发电机组成的试验平台,简单介绍1.5 MW异步双馈电机的温升试验。试验前须根据试验原理图,在双馈风力发电机试验操作界面上合上QF1、KM7,检查拖动机风机与风力发电机风机转向是否正确。
1.2.1 拖动机启动和调节
在双馈风力发电机试验操作界面上,启动后设定转速为500 r(风力发电机伸端逆时针转)或-500 r(风力发电机伸端顺时针转),拖动机开始转动,等实际转速达到设定转速时方可继续升速或降速,空载时每次调节转速最大不超过500 r(注意先启动变频器,在设定转速启动拖动机,以免启动电流过大,损害变频器)。