论文部分内容阅读
通过查定中心的通行能力,可确定中心站在现有设备情况下所能完成的任务量,发现设备上和作业组织上的薄弱环节,并根据中心站运量的增长趋势,有预见地采取加强设备能力和进行站场改造措施。
By ascertaining the capacity of the center, it is possible to determine the amount of work that the central station can do under the existing equipment and to find the weaknesses in the equipment and work organization. In the light of the increasing trend of the traffic volume of the central station, it is foreseen to take Strengthen equipment capacity and carry out station renovation measures.