论文部分内容阅读
本文就几个方面,对采区变电所变压器容量的合理选择,加以论述。试图寻求合理的选择方法,以达到提高设计水平和提高经济效益的目的。
In this paper, on several aspects, the rational selection of transformer capacity in substation of mining area is discussed. Trying to find a reasonable choice of methods to achieve the purpose of improving the design level and improve economic efficiency.