福建省漳浦县赤土乡农民林国章等15人,根据自建、自管、自用“三自”办电方针,以每人集资5万元,总投资75万元,于1993年6月间,在毗邻的湖西畲族乡后洞村前山垅里,兴建石坝1座(长50m、高2m),拦蓄水量6万m~3,并开挖引水渠长1km,把水引入本乡水尾场,利用发电水头70m,装机1台容量200kW,建成全县第一座股份制水尾水电站,于春节前投产,年均发电量70万kW·h。按新电新价每千瓦时0.32元计算,年可收入22.4万元,3~4
Fifteen people such as Lin Guozhang, a farmer from Chitu Township, Zhangpu County, Fujian Province, according to the principle of self-construction, self-management, and self-use of the “three-self” power-operated approach, raised 50,000 yuan per person, with a total investment of 750,000 yuan, in June 1993, In the adjoining Huxi Village, Houxi Village, Huxi Township, a stone dam (50m in length and 2m in height) was built, water storage capacity was 60,000 m3, and diversion canal was 1km long, and the water was introduced into Hongwei Shuiwei Farm. Utilizing a generating head of 70m, installed a capacity of 200kW, the first joint-stock Shuiwei Hydropower Station in the county was built and put into operation before the Spring Festival. The annual average generating capacity was 700,000 kW·h. According to the new price of new electricity 0.32 yuan per kilowatt-hour, annual income of 224,000 yuan, 3 to 4