陈行水库长江引水工程是上海市城市供水新开辟的第二水源工程,工艺流程如图1。图1陈行水库长江取水工艺流程陈行水库长江取水泵房位于上海市宝山区东北的长江中,设计总规模为140×104m3/d,分二期建设,一期土建按140×104m3/d一次建成、设备安装...
The Yangtze River Water Diversion Project of Chenhang Reservoir is the second water source project newly opened up in urban water supply in Shanghai. The process flow is shown in Figure 1. Figure 1 Changxing water intake process of Chenhang Reservoir The Changjiang water intake pumping station of Chenhang Reservoir is located in the middle of the Yangtze River in the northeast of Baoshan District, Shanghai. The total design scale is 140×104m3/d, which is divided into two phases. The first phase of civil construction is 140×104m3/d. Once completed, equipment installation...