论文部分内容阅读
我们车间是在文化大革命中建成投产的。现有小型烧结机三台。烧结生产在我厂还是一项新工艺。在各级党委的领导下,革命生产形势不断发展。但是,烧结机抽风系统放灰及漏风问题一直未能很好解决。厂党委坚持以阶级斗争为纲,认真贯彻《鞍钢宪法》,以实际行动批判“爬行主义”、“洋奴哲学”,取得了“苦战三个月,粉尘降一半”的优异成绩。
Our workshop was completed and put into production during the Cultural Revolution. The existing three small sintering machine. Sintering production in our plant is still a new technology. Under the leadership of party committees at all levels, the revolutionary production situation has been constantly developing. However, the sintering machine exhaust system ash and air leakage has not been well resolved. The party committee of the factory persisted in taking class struggle as the key link, conscientiously implemented the Anshan Iron and Steel Constitution, criticized “creepism” and “slaves philosophy” with concrete actions and achieved excellent results of “three months of hard fighting and half of dust reduction”.