本文介绍了风险管控在核电调试进度管理中的应用,对风险管控流程的四个步骤进行了阐述。结合某电厂3号机组一回路水压试验节点中风险管控在调试进度管理中应用的实例,对风险管控方法进行了进一步分析。
This paper introduces the application of risk management and control in the progress management of nuclear power commissioning, and describes the four steps of the risk management and control process. Combined with the practical application of risk control in the hydraulic test node of the first circuit of a power plant, the risk management and control methods are further analyzed.