海沟金矿选矿厂是一个日处理250t矿石量的中型黄金矿山选矿厂,总建筑面积6653m~2。该厂房是1982年设计的,1984年建成,并一次试车成功,受到有关人士的好评,该厂现已正式投产使用。根据工艺流程的要求,该厂房平面为L形,厂房布置在山坡上。厂房采用了排架承重结构形式,6m柱距,钢筋混凝土柱,钢操作平台,芬克式三角形轻钢屋架,镀锌瓦垄铁屋面。各车间内采用天然采光。各车间、各层操作平台之间都设置了两个以上的门和钢梯,为运行检修及工作人员带来了极
Haigou Gold Mine Concentrator is a medium-sized gold mine concentrator that processes 250t ore daily, with a total construction area of 6,653m2. The plant was designed in 1982 and completed in 1984. It was successfully tested once and was well received by the people concerned. The plant is now officially put into use. According to the requirements of the technological process, the plant is L-shaped and the plant is arranged on the hillside. The factory building adopts the form of a load-bearing structure, 6m column spacing, reinforced concrete columns, steel operation platform, Fink-type triangular light steel truss, and galvanized iron roof. Natural lighting is used in all workshops. More than two doors and steel ladders are installed between each workshop and each level of operation platform, which brings about extremes for operation and maintenance and staff.