基于层次分析法的DSM项目评估模型的研究

来源 :电力需求侧管理 | 被引量 : 0次 | 上传用户:Kdx1999
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
DSM项目的实施是一个包括发电厂、电力公司、用户等多个主体,既要考虑经济和社会效益,又要保证市场公平的复杂市场过程,有必要科学地对DSM项目实施效果进行综合的评价。利用基于指数标度的层次分析法分析并确定了各个影响因素的权重,利用数据的预处理形成了各个因素的评价集,综合考虑经济、环境和社会等多种因素建立了DSM项目的评估模型。通过算例分析验证了模型的合理性。 The implementation of DSM project is a complex market process that involves multiple subjects such as power plants, power companies and users. It not only needs to consider economic and social benefits, but also ensures fair markets. It is necessary to conduct a comprehensive evaluation of the effect of DSM projects scientifically . Analytic hierarchy process (AHP) based on exponential scale analysis and determination of the weight of each factor, the use of data preprocessing formed a set of evaluation factors for each factor, considering the economic, environmental and social factors to establish a DSM project evaluation model . Through the example analysis, the rationality of the model is verified.
其他文献
探讨中心动脉与肱动脉舒张压(DBP)、收缩压(SBP)、脉压(PP)、心内膜下心肌活力率(SEVR)、波形参数(fc)、每搏输出量(SV)、心排量(CO)、外周阻力(RS)等参数的相关性.通过对40例临床需要进行冠
为了降低电费回收风险,供电企业往往在信誉度较低的客户中实行预购电管理。基于负荷管理终端的预购电技术投入成本低,能有效提高营销管理水平和客户服务质量,在计量自动化技