论文部分内容阅读
今年6月份与7月上旬,地质勘探处组织了两个检查组,分赴6个水利枢纽对地质勘测工作进行了现场检查。其中一个组检查了陆水、乌江渡、清江永和坪三个枢纽;另一个组检查了汉江石泉、岷江偏窗子、宜昌葛洲坝三个枢纽。这次检查由于时间短促,检查组成员业务水平有限,工作是不够深入不够全面的,只着重了地质测绘成果质量的检查,工作方法又主要是抽查性质的。从这次检查中看到:各个枢纽勘测工作的业务水平都有了不同程度的提高,所提交的成果,质量上也
In June and early July of this year, the Geological Exploration Office organized two inspection teams and dispatched six water conservancy hubs to carry out on-site inspections of the geological survey. One of the groups examined the three hubs of Lu Shui, Wujiangdu and Qingjiang Yongheping; the other examined the three hubs of Hanjiang Shiquan, Minjiang Partial Window, and Yichang Gezhouba. Due to the short period of time, the inspection team members limited business level, the work is not enough depth is not comprehensive enough, only focused on the quality of geological mapping inspection work methods are mainly random nature of the test. From this inspection, we can see that the operational level of each survey and survey center has been improved in varying degrees. The results submitted and the quality