福斯河上三座大坝的改造——基于风险决策的实例研究

来源 :水利水电快报 | 被引量 : 0次 | 上传用户:X_DotNET
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
澳大利亚福斯河开发梯级由塞沙那坝(110m)、迪维尔斯盖特坝(DevilsGate)(84m)和佩卢纳坝(Paloona)(43m)3座大坝组成,建于1964~1971年。一旦大坝失事,对下游人口有重大威胁。根据采用1990年开发的综合方法对澳大利亚东南部极端降雨的评估结果,这3座大坝的溢洪道已不符合现行标准。溢洪道改造项目已于1999获得批准,计划于2003年施工完成。介绍了风险决策的过程。 The Flowserve River development cascade in Australia consists of 3 dams of Cezanne (110m), DevilsGate (84m) and Paloona (43m) built between 1964 and 1971 . Once the dam crashes, there is a serious threat to the downstream population. Based on the assessment of extreme rainfall in south-eastern Australia using a comprehensive methodology developed in 1990, the spillway of the three dams has fallen short of the current standards. The spillway reconstruction project was approved in 1999 and construction is scheduled to be completed in 2003. Introduced the process of risk decision-making.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
现在发去吉林省人民委员会办公厅关于省直机关的公文处理、专业会议和检查工作等方面的情况的报告一份,供作参考。为了进一步克服 We will now send a copy of the report
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
前方志愿军打美国鬼子,在军事战线上取得了伟大的胜利。后方的农民努力生产,支持抗美援朝和国家经济建设,也是一条战线。这是农业爱国增产战线。如果说,春耕播种是第一战役
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
卡托维兹的灯火卡托维兹,波兰的心脏, 重工业的花朵在这里怒放。一排排高炉,一排排竖井, 像旗帜一样拂着白云。黄昏里满城灯火辉煌, 有如茫茫大海金波荡漾。一支支灯柱,一支
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
由朱盈权、李俊义同志编著的《实用分析化学》一书将于1981年第一季度由四川人民出版社出版。本书主要内容包括:1.绪论;2.试样的制备;3.试样的分解方法;4.分析天平与称量;5.
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.