A quasi-synoptic interpretation of water mass distribution and circulation in the western North Paci

来源 :Chinese Journal of Oceanology and Limnology | 被引量 : 0次 | 上传用户:luowenying124
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Using the data of conductivity-temperature-depth (CTD) intensive observations conducted during Oct.-Nov.2005,this study provides the first three-dimension quasi-synoptic description of the circulation in the western North Pacific.Several novel phenomena are revealed,especially in the deep ocean where earlier observations were very sparse.During the observations,the North Equatorial Current (NEC) splits at about 12°N near the sea surface.This bifurcation shifts northward with depth,reaching about 20°N at 1 000 m,and then remains nearly unchanged to as deep as 2 000 m.The Luzon Undercurrent (LUC),emerging below the Kuroshio from about 21°N,intensifies southward,with its upper boundary surfacing around 12°N.From there,part of the LUC separates from the coast,while the rest continues southward to join the Mindanao Current (MC).The MC extends to 2 000 m near the coast,and appears to be closely related to the subsurface cyclonic eddies which overlap low-salinity water from the North Pacific.The Mindanao Undercurrent (MUC),carrying waters from the South Pacific,shifts eastward upon approaching the Mindanao coast and eventually becomes part of the eastward undercurrent between 10°N and 12°N at 130°E.In the upper 2 000 dbar,the total westward transport across 130oE between 7.5oN and 18oN reaches 65.4 Sv (1 Sv=10-6 m3s-1),the northward transport across 18oN from Luzon coast to 130oE is up to 35.0 Sv,and the southward transport across 7.5oN from Mindanao coast to 130oE is 27.9 Sv. Using the data of conductivity-temperature-depth (CTD) intensive op- tivaratory work during Oct.-Nov. 2005, this study provides the first three-dimension quasi-synoptic description of the circulation in the western North Pacific. Overview of novel phenomena are revealed, especially in the deep ocean where earlier observations were very sparse. During the observations, the North Equatorial Current (NEC) splits at about 12 ° N near the sea surface. This bifurcation shifts northward with depth, reaching about 20 ° N at 1 000 m , and then remains nearly unchanged to as deep as 2 000 m. The Luzon Undercurrent (LUC), emerging below the Kuroshio from about 21 ° N, intensifies southward, with its upper boundary surfacing around 12 ° N. Flash there, part of the LUC separates from the coast, while the rest continues southward to join the Mindanao Current (MC). The MC extends to 2 000 m near the coast, and appears to be closely related to the subsurface cyclonic eddies which overlap low-salinity water from the North Paci fic.The Mindanao Undercurrent (MUC), carrying waters from the South Pacific, shifts eastward upon approaching the Mindanao coast and eventually become part of the eastward undercurrent between 10 ° N and 12 ° N at 130 ° E.In the upper 2 000 dbar , the total westward transport across 130oE between 7.5oN and 18oN reaches 65.4 Sv (1 Sv = 10-6 m3s-1), the northward transport across 18oN from Luzon coast to 130oE is up to 35.0 sv, and the southward transport across 7.5oN from Mindanao coast to 130oE is 27.9 Sv.
其他文献
The 3-D ECOMSED ocean model was applied to establish a time-dependent boundary model for Jiaozhou Bay (JZB), in which the operator-splitting technique was used
在建筑工程的建设发展过程中,建筑电气施工质量决定了建筑运用电气水平,同时也决定了建筑电气系统运行的安全性和可靠性。同时,电气工程也影响着建筑工程整体质量。因此,在实际工
企业信息化项目管理质量的综合评价是衡量项目综合管理效果的重要因素。现有企业信息化项目中的评价问题主要集中在经济和技术评价领域,项目管理能力的评估大多仍停留在定性阶
根据圆锥动力触探试验的特点,针对重庆盆地地区特有的工程地质情况,本文概述了圆锥动力触探试验对各种土层的适用情况及其作用。
随着我国桥梁建设的突飞猛进,我国桥梁建设技术已经达到了世界前列。而灌注桩基础是桥梁最重要的基础形式之一。我国地域辽阔,工程与水文地质复杂多样,灌注桩成孔方法多样,绝大部
伴随我国社会经济体制的变更和发展,建筑领域在当前的土木工程当中占据这非常重要的地位,而施工过程中的钻孔技术是施工前期必须要重点掌控的环节.钻孔桩技术在整个建筑工程
房屋建筑工程节能施工技术在房屋建筑工程中的应用需要通过系统的组织,规范化的施工来真正的发挥出节能的效果,节能施工技术在房屋建筑工程的应用主要从墙体、屋面、门窗等方
随着经济的发展和人们生活水平的提高,城市规模的不断扩大,我国的建筑业也得到了蓬勃的发展,尤其是近年来智能化建筑的兴起,更是促进了建筑业的发展.但是,智能化建筑中电气节
我国的城市化进度不断加快,超高层建筑数量不断增多.所以,超高层电气设计问题是设计工作者不得不面对的.本文就主要对超高层建筑电气设计要点进行了简要分析.
随着经济的快速发展和和谐社会的构建,人们的生活水平越来越高,对道路桥梁的质量要求也越来越高,为满足社会经济的发展需求,道路桥梁的建设规模越来越大,在进行道路桥梁过渡段软基