论文部分内容阅读
依照英国路网公司于1月26日授予的4千万英镑立明顿温泉镇到海福德区段的信号设备更新合同,西门子铁路自动化公司启动了该信号改造工程。为期22月项目将把目前由班伯里北和班伯里南信号站控制的信号区域的操作转移到路网公司西中部信号中心的一个工作站处。立明顿温泉镇信号中心剩余的信号控制功能也将被转移至西中部信号中心。跟既有的设计相比,新的LED信号机将降低维护要求,同时西门子轨护西锁计算机联锁正打算应用于
In accordance with the signal equipment renewal contract awarded by British Road Network on January 26 to the £ 40 million spa town in Heint, the start-up of this signal was carried out by Siemens Automation. The 22-month project will divert the current operation of signal areas currently controlled by Banbury North and Banbury South stations to a station at the West Central Signal Center of the Network Company. The remaining signal control functions in the Signal Center at Hot Springs, Minington will also be transferred to the Midwest Signal Center. Compared with the existing design, the new LED signal will reduce the maintenance requirements, while the Siemens Rail Protection West lock computer interlock is being applied to