本刊第1期刊载的“柔性墩桥宜采用简支梁”一文中,曾引用午汲桥例子来说明柔性墩桥在养护上可能发生的问题。由于本人在编写中没有全面反映该桥的实际情况,经参加该桥设计及施工处理工作的同志指出,现作如下补充说明:午汲桥于1972年11月架设第一线梁,随即进行动载试验并正式通车,至1973年11月架设第一线梁之前,运行情况良好。在架第二线梁时,施工单位出
In this paper, No. 1, “flexible pier should be used to facilitate the bridge beam,” a paper, had cited examples of afternoon bridge to illustrate the flexible Pier Bridge in the conservation problems that may occur. As I did not fully reflect the actual situation in the preparation of the bridge, the comrades participating in the design and construction of the bridge pointed out the following supplementary explanation: The first beam was laid at Noon Bridge in November 1972, The test was carried out and officially put into operation. It operated in good condition until the first beam was erected in November 1973. In the second beam line, the construction unit out