论文部分内容阅读
以护坡墙与护坡桩组合,分段开挖,逐层推进,最后完成深基坑的围护,谓之“逆作法”
With the combination of slope protection and slope protection piles, excavation is carried out step by step, step by step, and the enclosing of the deep foundation pit is finally completed.