作为我国目前同期开工里程最长、海拔跨越范围最大的750千伏电网工程,在短短13个月的时间中便顺利投运,新疆与西北主网联网750千伏第二通道工程创造了建设新纪录的同时,也打造了一条加快西部能源资源优化配置的精品工程。面对恶劣的施工环境、复杂的建设协调,沙漠戈壁中奋战的建设者身上发生过怎样的感人故事?按照“两型一化”“两型三新”的要求,工程如何保证技术创新成功实践运用?本刊记者兵分三路,赴甘肃、青海和新疆实地采访,为您讲述该工程台前幕后的精彩故事。
As the 750,000-volt power grid project with the longest mileage and the highest altitude in our country at the same period, it successfully put into operation in just 13 months and the construction of the 750,000-volt second-channel project of main network interconnection between Xinjiang and Northwest China At the same time, it also created a quality project to speed up the optimization of energy resources in the western region. In the face of poor construction environment, complex construction and coordination, the desert Gobi fought builders who had what touching story? In accordance with the “two types of a” “two types of three new ” requirements, how to ensure the project Successful application of technological innovation? Reporter soldiers divided into three routes to go to Gansu, Qinghai and Xinjiang field interviews, tell you about the wonderful story behind the stage.